Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facilitys floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMCs director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

Press Releases
CHICAGO Registration for the 2026 International Summit
Press Releases
CHICAGO The American Society for Health Care Engineering (ASHE), a professional membership group of 陳栠勛圖 (AHA),
Certifications
Demonstrate that you have the training and knowledge to help ensure patient safety during hospital construction, renovation or maintenance projects!
Press Releases
CHICAGO The American Society for Health Care Engineering (ASHE), a professional membership group of 陳栠勛圖, is pleased
Press Releases
CHICAGO The American Society for Health Care Engineering (ASHE) of 陳栠勛圖 has announced the winners of its 2025 Energy
Press Releases
CHICAGO The American Society for Health Care Engineering (ASHE) of 陳栠勛圖 has announced the winners of its 2025 Energy