Managing Hospital Emergency Power Systems: Testing, Operation, Maintenance, Vulnerability Mitigation, and Power Failure Planning

 

publication cover
David L. Stymiest, PE, CHFM, CHSP, FASHE

Hospitals face new requirements and more challenges today than ever before. These challenges demand a holistic approach to EP system managementblending utility management with emergency management and infrastructure master planning. Factoring in continuous quality improvement and staff education means that, moving forward, EP systems must be managed where many hospitals simply operated them in the past. More attention should also be paid to EP system maintenance, and that need brings its own set of issues. Our hospital EP systems must operate reliably when they are needed, for as long as they are needed, and provide power to their connected loads without failure. These requirements are daunting, and satisfying them is no easy task. This monograph describes a complete EP system management program intended to satisfy these needs that includes all elements of the emergency power reliability equation.

 

 Access PDF Members can download a PDF of the entire monograph
Catalog number: 055914
Member: $25.00, Nonmember: $35.00

 

 

Related Resources

Resources
Chillers can create a healthier health care environment, cut energy costs, and be tailored to fit almost any need.
Resources
Four teams of engineers and facility managers worked to identify hidden energy savings in the facilitys energy infrastructure.
Resources
EPA released updated models that enable commercial building owners across many U.S. building sectors to calculate revised 1100 ENERGY STAR簧 scores.
Resources
Lets look at some highlights from one of our recent quizzes
Resources
Discover the power of sustainability messaging to motivate your workforce. Learn effective strategies to engage employees in sustainable behaviors.
Resources
A project designed with sustainability in mind will naturally produce better results than one that requires integrating sustainability elements later