Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facilitys floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMCs director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
On-Demand Educational Webinars
This seminar explores the drivers behind these changes and prepares the attendee to navigate the quickly evolving landscape through practical
Standards/Guidelines
The purpose of this standard is to prescribe the procedures, methods, and documentation requirements for the design, construction, and operation of
On-Demand Educational Webinars
Compliance Tools
Use this worksheet to periodically check for reactive maintenance concerns that could be wasting time and energy. Focusing first on squeaky wheels
Guides/Reports
This report from HKS and Arup, with peer review and collaboration from 陳栠勛圖walks through design strategies that can help facilities stay operational
On-Demand Educational Webinars
Learn about plant optimization and the variety of approaches used for minimizing costs. Understand the steps towards an optimized plant. Hear a few