Success Stories - University of Maryland Medical Center

Overview of Case Study

UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facilitys floorspace to 2.5 million square feet.

Richie Stever, CHFM, CLSS-HC, UMMCs director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).

Read More

Related Resources

On-Demand Educational Webinars
Walk through the electrical safety roadmap from pre-design through installation and post-installation.
On-Demand Educational Webinars
This course will walk participants through site acceptance and in-service testing and will review best practices that will empower facility owners
On-Demand Educational Webinars
In this webinar, the presenters will review current and proposed CMS/TJC requirements in the context of ASHRAE 188 and will discuss practical
On-Demand Educational Webinars
This presentation will provide an overview of annual fire door inspection requirements, strategies for remediation of non-compliant issues and on-
On-Demand Educational Webinars
On-Demand Educational Webinars
George Mills, CEO of ATG (a JLL company), and former Director of Engineering with The Joint Commission, will focus on Life Safety in business